24.3
2022
The Cox Pond Conservation Easement is a 24-acre mitigation project by Wildlands Engineering Inc in Wayne County, North Carolina, designed to restore riparian buffers and improve water quality in the Neuse River Basin. The project, developed under the Cox Pond Mitigation Bank, is focused on nutrient offset and riparian buffer mitigation, ensuring long-term conservation and environmental restoration. The site, previously used for agricultural purposes, included crop fields and areas subject to animal waste application.
By converting these areas into protected riparian buffers, the project aims to reduce nutrient and sediment runoff, enhance terrestrial and aquatic habitats, and improve stream stability.
The easement establishes a 200-foot-wide buffer along four tributaries and three ditches, filtering pollutants before they reach downstream water bodies, such as Brooks Swamp, Thoroughfare Swamp, and the Neuse River. One of the primary benefits of this project is its ability to generate buffer and nutrient offset credits. Developers and municipalities seeking to offset environmental impacts can purchase these credits to comply with state and federal water quality regulations. The project aligns with North Carolina’s Nutrient Sensitive Waters (NSW) management strategies, ensuring that conservation and development can coexist sustainably.
By securing the Cox Pond site under a permanent conservation easement, this project protects critical riparian areas, supports native vegetation restoration, and promotes long-term environmental resilience. This initiative represents a significant step toward balancing land use with water quality protection and ecosystem restoration in the Neuse River Basin.
Our Role
Mitigation Type
Learn More